One plant is a question. Forty is a problem.

You have solar across dozens of sites. Find out which of them generate saleable carbon credits — and what the portfolio is worth — in an afternoon rather than a quarter.

  • Most groups your size have no one in-house who can answer this. That is not a gap in your team; the rules changed twice in two years.
  • We'll tell you which sites qualify, under which route, and what each is worth. Whether or not you work with us afterwards.
  • Around R1.33 million per MW over five years, on conservative assumptions we'll show you.
  • Sites commissioned before 2025 are turned away by most providers. We can often still include them through an existing project.

Indicative value · at 1.0 MW

R1.15m–R1.33m

4 of 4 routes still in play

Answer two questions and we’ll show what this builds to.

At R270 a tonne.

MW
0.1 MW50 MW

Where does your power go?

Four routes exist. Answer three questions and we’ll narrow them.

Three minutes gets you this

A verdict on all four routes, a score with its reasons, what's missing, and what it's worth — the whole thing, shown in full below.

B

Your plant qualifies under two of four routes

Recommended: grid connected, VCS v5.0 — the only route open before 1 January 2027

VCS v4.7

behind the meter

not eligible

VCS v5.0

grid connected

recommended

I-REC

certificates

also open

DER

issued in days

needs info

Indicative value, five years at 4.2 MW

R4.85m–R5.60m

Window remaining

3 months

An example result. Yours will differ.

See the full example report

This is the full report for our example plant. Yours takes three minutes.

Aindicative band

Your indicative verdict

This plant looks like a strong candidate for a carbon project.

Your free verdict

On these answers your plant lands on VCS v4.7 — behind the meter. That is the highest-value route available to you.

The qualification matrix

Indicative, based on your answers. Tap any row for a plain-language explanation.

How much of your generation goes to your own load versus the grid decides which route can even apply. We confirm this for your project.

How we read this plant

Five factors that decide whether a project stands up. Indicative, and never all high.

Eligibility certainty0
Additionality strength0
Data readiness0
Documentation distance0
Claims risk0

Weighted against six years of projects we have taken through the process ourselves — including the ones that did not make it.

Indicative value

R4.27 million to R4.92 million

Indicative value · 4.4 years remaining on our project · at 4.2 MW

Our project credits until March 2031. Every month before you join is a month you can't get back — roughly R22k per megawatt.

The period is renewable twice, so it could run to 2045. Renewal isn't guaranteed, so we quote what's certain.

  • Yield: 1,500 kWh/kWp (conservative)
  • Emission factor: 0.94 tCO2e/MWh (South Africa)
  • Carbon price: R234–270/tonne (tax-linked, conservative forecast to our current sale price)
  • Owner share: 70% (indicative)

Monitoring period 3 is open until 30 November 2026.

Miss it and your plant waits for the next period, which runs a full twelve months.

How long you earn

We quote the first crediting period. Renewal is upside — it depends on the project still qualifying when the time comes, so we never headline it.

RouteFirst periodWe quote
VCS v4.7Yours7 years4.4 years(remaining)
VCS v5.05 years5 years
I-REC1 yearannualised
DER12 monthsannualised

A behind-the-meter joiner inherits what's left of our project's crediting period, not a fresh term — currently 4.4 years.

What it adds up to.

Cumulative value across the 7-year first period. Dashed bars are renewal upside — real, never guaranteed.

R1.96mR3.92mR5.88mR7.83mY1Y2Y3Y4Y5Y6Y7
Cumulative by end of first periodR6.79m – R7.83m

What is missing

Have

Proof of who holds the environmental attributes

You can only sell attributes you actually hold.

Have

First-generation date evidence

This date decides which route, and which deadline, applies.

Blocked

Historical generation data

Verification is far easier with historical data.

Have

Confirmation the generation is not already claimed

Generation counted elsewhere usually cannot be sold again.

Not ready to spend anything?

Download the free PDF and come back whenever. Nothing expires.

The Verified Report, one plant.

Your free result is built on what you told us. This one is built on what we verified.

  • · We read your ownership documents and confirm who actually holds the rights
  • · We read your PPA or wheeling agreement and confirm whether the attributes travelled
  • · We connect your generation data and assess it against what verification will need
  • · We run the additionality benchmark on your real financials, not on assumptions
  • · A named next action from a person, and a file you can hand to a verifier

R1,950 · Back within two working days.

Get the Verified Report

More than one plant?

A portfolio is priced differently and starts with a conversation.

Book a call

Four routes.

Knowing which one is yours is the whole problem.

VCS v4.7behind the meter
If you register before 1 Jan 2027
7 years, renewable twice, or 10 years fixed
If you register from 1 Jan 2027
5 years, renewable twice
Time to first payment
9–13 months
Size limit
15 MW per project
Deadline
new listings close 1 Jan 2027
Can you try it first
no
VCS v5.0grid connected
If you register before 1 Jan 2027
5 years, renewable twice
If you register from 1 Jan 2027
5 years, renewable twice
Time to first payment
12–18 months
Size limit
none
Deadline
register before 1 Jan 2027
Can you try it first
no
I-RECcertificates
If you register before 1 Jan 2027
1 year at a time
If you register from 1 Jan 2027
1 year at a time
Time to first payment
months
Size limit
none per device; groups capped at 50 sites / 5 MW
Deadline
none
Can you try it first
yes
DERDecarb-certified
If you register before 1 Jan 2027
12 months
If you register from 1 Jan 2027
12 months
Time to first payment
days
Size limit
none
Deadline
none
Can you try it first
yes

Only one route changes with the date. The grid-connected route runs on the current standard either way.

No size limit on the main route. From one megawatt to five hundred.

The route changes with the size. Whether we can do it does not.

One plant is a question. Forty is a problem.

A single array is a yes or no. A portfolio is a spreadsheet nobody owns — different commissioning dates, different export profiles, different owners of the rights. Some sites will already be past their window. Some will qualify under a route you haven't heard of.

We run every site and give you the list, ranked, with the ones that expire first at the top.

Assess a portfolio

What this costs

Free

The whole assessment is free.

R0the result, always free

All twelve questions, no gate, no payment, no account. You get the routes open and closed with reasons, a score band, an indicative value with every assumption shown, a gap list, and a PDF of all of it.

One plant

The Verified Report, one plant.

R1,950per plant, once

Your free result is built on what you told us. This one is built on what we verified.

  • We read your ownership documents and confirm who actually holds the rights
  • We read your PPA or wheeling agreement and confirm whether the attributes travelled
  • We connect your generation data and assess it against what verification will need
  • We run the additionality benchmark on your real financials, not on assumptions
  • A named next action from a person, and a file you can hand to a verifier

Back within two working days.

Get the Verified Report
Portfolio

Assessing a portfolio is priced.

From R35,000scoped to your site count

Running dozens of sites through the engine, resolving each set of ownership documents and ranking them by expiry is real work. You'll know the number before we start.

Book a portfolio assessment
Partners

Licensed for partners.

Licence + shareinstallers, OEMs, traders, banks

Equipment makers, electricity traders, consultants and banks can run the engine under their own brand. Licence plus a share of what it earns.

Explore partner licensing

We'll tell you if the answer is no

We have no stake in your answer. The engine tells you what you qualify for whether or not you work with us — and it says no often, because most plants do not qualify for everything.

142,345
tonnes issued

Under our own ISO-accredited standard.

14,798
tonnes verified

In our first Verra monitoring period, pending issuance.

22,756
plants monitored

The dataset the engine is calibrated against.

208.8
GWh generated

Across the plants we monitor.

ISO logo

ISO-accredited

Our own standard is independently accredited

AI for Good logo

AI for Good — winner, climate 2025

COP29 logo

COP29 — emerging tech finalist

Our project is registered with Verra as VCS 5536.Look it up

We can tell you whether you qualify. Nobody can promise you a registration.

Customers, technology partners and integrations

Customers and partners

  • Equites logo
  • GoSolr logo
  • Versofy logo
  • Yellow Door Energy logo
  • MLT Power logo
  • Real Time Solar logo
  • Respek Nature logo

Technology and data

  • Polygon logo
  • Orbify logo

Integrates with

  • Huawei logo
  • SolarEdge logo
  • Sigenergy logo
  • Deye logo
  • Solis logo
  • Sunsynk logo
  • Solarman logo
  • meteocontrol logo
  • AUGOS logo
  • ATESS logo

Your start date already earned you something.

The heaviest requirements under the new standard — a stakeholder engagement plan, a benefit-sharing mechanism, a safeguards assessment — are tied to when a project was first committed to, not when it registers.

Any project committed before 1 January 2027 has all three deferred to 2030. A project starting after that date has to complete them before it begins.

That part is locked in. What hasn't locked in is your crediting period.

Two clocks.

One you know about. One you probably don't.

0months of your window remain
Locked inWhat's yours?

Your start date

Already fixed. It's what defers the heaviest requirements to 2030.

Registration request dueHow long do you have?

Registration request due

Validation takes nine to twelve months and has to finish before submission. The clock started the day your plant first produced a kilowatt-hour. Check where your plant sits.

your plant · first generation
12-month validation window
first generationtoday
1 February 2028 · registration request due

4 months to decide, then 12 months of validation. Your deadline is 1 February 2028.

Roughly R1.17m per megawatt over the 4.4 years remaining, forfeited permanently.

VCS v5.0 waiting list · 2027

The questions that actually stop people

You can find out in three minutes.

No sign-up. No email until you want a copy. No sales call.

A trader, equipment maker or consultant? Partner with us.